Construction of roads
Participation in design works and construction of III category access road leading to the site for disposal and processing of drill muds and oil bearing soil in the Mangistau region. The length of the road is 12,5km. Client – Ecological Technological Centre LLP
Participation in design works and construction of III category access road to the site for disposal and processing of drill muds and oil bearing soil in the Atyrau region. Length of road – 6.2 km. Client – Ecological Technological Centre LLP
Construction of car road for access to the drilling site at the Yuzhno-Karpovskaya 1 field. Client – Kazkormunay LLP, Western Kazakhstan Region
Participation in designing and construction of III category road for access to the technological site for drilling waste neutralization. Client – CTH LLP.
Participation in designing and construction of Taypak-Satimola access road (1 stage) with the use of organic mineral mix “SCREPTON”. Client – Satbor LLP. Launch into operation – November 2013.
Together with EcoDor LLP, Samruk-Tabigat LLP constructed the Taypak-Satimola car road with the use of Screpton technology (length of road – 30.8km). Our efforts are directed at developing long-term bilateral relations through improvement of the SCREPTON technology and improvement of technical capacities for maximum client satisfaction.
Subcontracting works at the object "Construction of a route for cargo transportation for facilities in the north-eastern part of the Caspian Sea is a road for transportation of large-sized cargoes on the territory of the Republic of Kazakhstan". Client – TCO LLP, Atyrau region
Subcontracting works at the object "Construction of a route for cargo transportation for facilities in the north-eastern part of the Caspian Sea is a road for transportation of large-sized cargoes on the territory of the Republic of Kazakhstan". Client – TCO LLP, Atyrau region
2) Land grader and leveler “XCMG GR-215”, manufactured in 2012 – 1 unit
3) Land grader and leveler “XCMG GR-215” manufactured in 2014 – 1 unit
4) Asphalt placer “CAT” manufactured in 2013 – 1 unit.
5) Bulldozer “SHANTUI SD-23” manufactured in 2008 – 1 unit
6) Bulldozer “SHANTUI SD-16” manufactured in 2014 – 1 unit
7) Bulldozer “KOMATSU” manufactured in 1986 – 2 units
8) Pneumatic tyred roller “XCMG XP-163” manufactured in 2013 – 1 unit
9) Pneumatic tyred roller “XCMG XP-203” manufactured in 2017 – 1 unit
10) Pneumatic tyred roller “XCMG XP-226” manufactured in 2011 – 1 unit
11) Soil roller “XCMG XP162J” manufactured in 2011 – 2 units
12) General purpose roller “ДУ МВ-99-1” manufactured in 2014 – 1 unit
13) Loader “ZL-50G”, 2.8 cu.m., manufactured in 2008 – 1 unit
14) Loader “ZL-50G”, 2.8 cu.m. , manufactured in 2014 – 1 unit
15) Loader “ZL-30G”, 2.2 cu.m., manufactured in 2006 – 1 unit
16) Loader “NAR-50”, 3 cu.m., manufactured in 2012 – 1 unit
17) Digger “JCB” 1.5 cu.m., manufactured in 2012 – 1 unit
18) Digger “Hitachi Zaxis-240G”, 1.4 cu.m., manufactured in 2013 – 1 unit
19) Digger “Hyundai”, 2 cu.m., manufactured in 2007 – 1 unit
20) Regenerator-mixer “Caterpillar RM300” manufactured in 2010 – 1 unit
General construction works
Construction of supporting structures, interior and exterior finish works, Almaty. Client – Astana-Nedvizhimost” JSC
Participation in designing and turn-key-ready construction of a site for disposal and processing of drill muds and oil bearing soil in Mangistau region. Client – Ecological Technological Centre LLP
Participation in construction of a unit for preparation of drilling waste for disposal in the Aktobe region. Client – Aktobe Eco Centre LLP (waterproofing works)
Construction of a drilling site at the Yuzhno-Karpovskaya 1 field Western Kazakhstan region Client – Isker Consortium
Participation in designing, construction and launch into operation of a technological site for drilling waste neutralization, access road and high voltage line 10 for the site. Client – “CTH” LLP
Thermal proofing of pipeline, fire proofing of metal structures, fire proofing of pipelines (FendoliteMI), blasting dust and paint works, color coding of pipelines in the Atyrau region, Karabatan, Bolashak oil refinery. Client – MCC Kurylys Atyrau LLP
Construction of intraplant roads, construction of paved car roads, construction of parking lots for cars, Atyrau region, Karabatan, Bolashak oil refinery. Client – WSS LLP
Welding and assembly of metal warehouses for storing inert materials, construction and assembly of a re-fabrication unit, Atyrau region, Karabatan, Bolashak oil refinery. Client – Isker Consortium
Major renovation of administrative building. Client – Kaspiy Neft JSC
Manufacturing of fencing, galvanization, assembly of fencing, converting of foundation beams, Atyrau region, Karabatan, Bolashak oil refinery, Client – Isker-KSS LLP
Earth excavation, compacted backfill , concreting of foundations of elevated roadways, manufacturing of groundsills, construction of bridging, underground communications works, assembly of metal structures and prefabricated panels, Atyrau region, Karabatan, Bolashak oil refinery. Client – ISKER Consortium
Participation in designing and renovation of technological sites for drilling waste neutralization. Client – “CTH” LLP
Construction of expansion of technological site for drilling waste neutralization. Client – CTH LLP
Construction of administrative building. Client – Temir-Renta LLP
Ground works. Commissioned by Tengizchevroil LLP, general contractor – IGS Corporation JSC
Construction of car repair workshops, supply and assembly of equipment for car repair workshops. Construction of meshwire fencing 1 km, project NPC-Atyrau. Client – KSS JSC
Construction of main electrical substation #1. Construction of rail and beam plant. Client – Soyuzkomplekt JV LLP
Construction and profiling of the Tengiz field Construction of a new temporary residence village Orken. Client – Isker Bonatti LLP
Construction of mesh wire fencing, concrete coating of foundation beams OPS-Akistau and OPS-Ganyushkino. Client – KSS JSC
-
1) Bulldozer “SHANTUI SD-23” manufactured in 2008 – 1 unit
2) Bulldozer “SHANTUI SD-16», manufactured in 2014 – 1 unit
3) Soil roller «XCMG XP162J», manufactured in 2011 – 2 units
4) Loader «ZL-50G», 2.8 cu.m., manufactured in 2008– 1 unit
5) Loader «ZL-50G», 2.8 cu.m., manufactured in 2014 – 1 unit
6) Loader «ZL-30G», 2.2 cu.m., manufactured in 2006 – 1 unit
7) Loader «NAR-50», 3 cu.m., manufactured in 2012– 1 unit
8) Digger «JCB», 1.5 cu.m., manufactured in 2012 – 1 unit
9) Digger «Hitachi Zaxis-240G», 1.4 cu.m., manufactured in 2013 – 1 unit
10) Digger «Hyundai», 2 cu.m., manufactured in 2007– 1 unit
11) dumping trucks MAZ brand, cargo lifting capacity – 23-25 tonnes, manufactured in 2006-2014 – 40 units
PIPELINE ASSEMBLY WORKS
Subcontractor works for construction of a CPC facility at the Tengiz field (assembly of main pipelines) in the Atyrau region
Subcontracting works for major construction of a facility at “The Chinarevskoye oil and gas condensate field”-“Main pipelines system Intergas Central Asia”. The works were commissioned by Zhaikmunay LLP. The works involved a complicated welding procedure: replacement of the existing pipeline ∅ 1220 mm “Orenburg-Novopskov” with the length of 500m. The procedure lasted for 72 hours. A pipeline with the diameter of 630mm was welded, proofed, constructed and embedded.
Construction of flowlines to the Karachaganak field was completed in Western Kazakhstan. This was done for KPO b.v. LLP. General contractor - Bonnati.
Construction of flowlines to the Karachaganak field was completed. This was done for KPO b.v. LLP. General contractor - Bonnati.
Subcontracting of welding and assembly works at the Karachaganak oil and gas condensate field. Client – KPO b.v. LLP, Western Kazakhstan Region.
-
1) auxiliary equipment (trailer suspension, grinders, slings and straps)
2) diesel generator, year of manufacturing- 2006,2008,2011,2013– 4 units
3) shot blaster «7CLEMCO SCW(B)-2452», manufacturing year 2012 – 2 units
4) mobile unit for thermal treatment of welding seams, manufacturing year 2016 – 4 units
5) control unit for uniformity of protective insulation coating for Holiday pipelines, manufacturing year 2012 – 1 unit
6) orbital argon arc welding «Mechtig-3000» – 1 unit
7) welding equipment «Lincoln», year of manufacturing 2008 – 4 units
8) welding equipment «Miller», year of manufacturing 2008 – 8 units
9) pipe laying crane «JG-30», 30 tonnes, year of manufacturing 2008 – 1 unit
10) pipe laying crane «JG-70», 70 tonnes, year of manufacturing 2008 – 1 unit
11) pipe laying crane «KOMATSU D355-C3», year of manufacturing 1983– 1 unit
12) pipe laying crane «KOMATSU-355C», year of manufacturing 1986– 1 unit
13) self-propelled centralizer – 1 unit
14) digger «JCB», 1.5 cu.m., manufacturing year 2012 – 1 unit
15) digger «Hitachi Zaxis-240G», 1.4 cu.m., manufacturing year 2013– 1 unit
16) digger «Hyundai», 2 cu.m., manufacturing year 2007 – 1 unit
HORIZONTAL DIRECTIONAL DRILLING
Subcontracting construction works at the following site: Uzen-Atyrau-Samara oil pipeline at the oil pumping station section – 663 km, oil pumping station “Atyrau”, diameter 1020 mm. Underwater line through the Ural river with the use of the horizontal directional drilling (HDD) technology. Total length – 9,5 km. Client – Kazstroyservice LLP (Client Kaztransoil JSC), Atyrau region
Participation in designing and construction of flowlines with an underwater line through the Yembulatovka river from well D#32 to the PGPT at the Chinarevskoye oil and gas condensate field (COGCF). Client – Zhaikmunay LLP, Western Kazakhstan Region
COGCF. Underwater lines for infield pipelines through the Yembulatovka river inverted siphon №4. Client – Zhaikmunay LLP, Western Kazakhstan Region.
COGCF. Underwater lines for infield pipelines through the Yembulatovka river inverted siphon №5. Client – Zhaikmunay LLP, Western Kazakhstan Region.
-
1) horizontal directional drilling unit, «Vermeer-D130X150»(USA), manufacturing year 2013– 1 unit
2) auxiliary equipment (trailer suspension, grinders, slings and straps)
3) diesel generator, manufactured in 2006,2008,2011,2013– 4 units
4) shot blaster «7CLEMCO SCW(B)-2452», manufacturing year 2012– 2 units
5) mobile unit for thermal treatment of welding seams, manufacturing year 2016 – 4 units
6) control unit for uniformity of protective insulation coating for Holiday pipelines, manufacturing year 2012 – 1 unit
7) orbital argon arc welding «Mechtig-3000» – 1 unit
8) welding equipment «Lincoln», year of manufacturing 2008 – 4 units
9) welding equipment «Miller», year of manufacturing 2008 – 8 units
10) pipe laying crane «JG-30», 30 tonnes, year of manufacturing 2008 – 1 unit
11) pipe laying crane «JG-70», 70 tonnes, year of manufacturing 2008 – 1 unit
12) pipe laying crane «KOMATSU D355-C3», year of manufacturing 1983– 1 unit
13) pipe laying crane «KOMATSU-355C», year of manufacturing 1986– 1 unit
14) self-propelled centralizers – 1 unit
15) digger «JCB», 1.5 cu.m., manufacturing year 2012 – 1 unit
16) digger «Hitachi Zaxis-240G», 1.4 cu.m., manufacturing year 2013– 1 unit
17) digger «Hyundai», 2 cu.m., manufacturing year 2007 – 1 unit
INFRASTRUCTURE
“Samruk-Tabigat” LLP has the capacities to set up autonomous infrastructure for accommodating equipment repair personnel on the territory where construction and assembly works are held.
Samruk-Tabigat has its own production facilities located at: 8/1 Zhelayevo industrial zone, Uralsk, Western Kazakhstan region
-
1) crane truck «XCMG»(25 tonnes), manufactured in 2012 – 1 unit
2) fuel tanker “MAZ” (11 cu.m.) manufactured in 2013 – 1 unit
3) Mobile car repair workshop “Ural 4320”, manufactured in 2014 – 1 unit
4) bus “Mercedes-Benz SPRINTER” (20 places) manufactured in 2014 – 2 units
5) pickup truck “Toyota HILUX”, manufactured in 2009-2014 – 4 units
6) “УАЗ 22069 033” manufactured in 2008 – 2 units
7) loader crane “ГАЗ 33081” manufactured in 2008 – 3 units
8) haul truck “Краз6443” manufactured in 2010 – 1 unit
9) trawl “МАКТ-9378-1”, manufactured in 2011 – 4 units
10) live-in trailers (can accommodate up to 6-10 people) – 8 units
11) mobile office – 2 units
12) mobile canteen – 2 units
13) mobile bath unit – 1 unit
- Pipe stock welding workshop, diameter from 15 mm to 1500 mm
- Repair workshop complete with mill-drive turning equipment
- Sandblasting paint shop
- Heated parking for special equipment and machinery
- Open parking
- Warehouse
- Railroad dead-end track